Panels on time
A panel that arrives late holds up the electricians, the testing and the handover. That is why the delivery date comes with the quotation, and the workshop is scheduled around it.
Low-Voltage Panels
In series, one design
Distribution panels for hotel rooms and floors, offices and buildings. Each panel is labelled for its position and reaches the site in the order it will be installed.
Fire-Fighting Panels
Fire-pump sets
Control panels for fire-pump sets to EN 12845.
BMS & Control Panels
Building automation
BMS cabinets and control panels for HVAC and building services, wired to the designer's I/O lists and ready for commissioning.
Every panel we deliver is:
Built with components from recognised manufacturers
Compliant with EN 61439
Wired and tested in our workshop
Labelled to the drawings
Delivered with its wiring diagrams
Short queue, fixed delivery date.
Certification
Our panels comply with EN 61439, the standard for low-voltage switchgear and controlgear assemblies. Compliance is backed by a test report from an accredited laboratory.
How we work
- You send us the drawings. A single-line diagram, a circuit list, or simply what the panel has to feed.
- You get a quotation and a delivery date. You approve the panel drawings before we start building.
- We build and test in our workshop, to the drawings you approved.
- We deliver the panels labelled and with their drawings, in the order the site needs them.
Inspection shows when a panel needs replacing
Our team checks panels through visual inspection, measurements, thermography and ultrasound across industrial plants and hotels. Loose terminals, overloaded circuits and ageing breakers show up long before they fail. When a panel has to be replaced, the replacement goes into the schedule instead of becoming an emergency.
Maintenance and monitoring